Solar Installations in Saguache County, Colorado
County-level solar data from LBNL Tracking the Sun dataset
Total Installations
34
Total Capacity
1 MW
Average Cost
$4.09/W
Median: $3.55/W
Avg System Size
14.4 kW
14.08¢/kWh
State Electricity Rate
$3,256
Est. Annual Savings
-6.4%
vs State Average Cost
Source: LBNL Tracking the Sun / U.S. Department of Energy